Mission Performance Resumes Racing - Update
11 September 2015
UPDATE 1315 UTC
Mission Performance resumed racing at 1243 UTC today (11 September 2015) after successfully transferring parts for the low pressure pump for their watermaker from ClipperTelemed+.
UPDATE 0815 UTC:
ETA with ClipperTelemed+ now expected 1200 UTC today (11 September 2015)
MISSION PERFORMANCE
Mission Performance is reversing course to rendezvous with ClipperTelemed+ in order to collect a replacement low pressure pump for their watermaker which is not fully functioning.
Spare components are dispersed around the fleet for such eventualities.
There is no immediate issue but this will enable the problem to be resolved.
Any claim for redress will be considered by the Race Committee.
The yachts are anticipated to rendezvous by approximately 0900 UTC on Friday 11 September.
Join The Race